New Piv build!

Many discussions about improving the current ramps led to a large goal completed with a good group of friends at hand. In two days with weeks of planning we succeeded from pen and paper.

Screenshot

Using the existing quarter pipe, bank, and wallride set up built with a Freshpark quarter pipe, and plywood. It was sketchy to ride and sometimes partially collapsing. First how could you add to the flow of the space? Can we improve the permanent features currently in place. We expanded the bank to ledge on the far left for more room and spacing for the pitch of the bank. On the right was an easy box styled form 6 inches thick supported in the middle to prevent the bank from snapping in half. Replication of the plywood bank worked perfect for the 34″ tall quarter pipe for ride offs. The left bank from quarter worked out to half a 18 inch drop from coping height. This maximized options and finished nicely.

Screenshot

◇ new-piv-build.md
163 words·0 comments
◫ NORMAL eastcrust blog — New Piv build!
[ Quick15 ] ends — · rss ↗ · uptime: 0s